1.how to configure to send mail when an item checkout/item checkin. <br>I&#39;m able to send mail , when a patron account is created. - hence it shows the mail functionality with my fedora linux machine/ with koha<br>But while i do checkout/checkin , the mail should be sent, if the specify 0 in the delay, will the mail will be sent on today&#39;s date.<br>

<br>2.In circulation configuration - my system preference has only 28 attribute values to
be changed , bu the liblime site has more features.(38 attribs). IS
This is due to multiple branch modes. I&#39;m using koha version
3.0002012.  Is this addtional features available in latest versions
greater tha 3.02. So, that i can enable certain features during circulation<br><br>3.I have selected Marc21 frameworks on, and selected addition for custom frameworks, <br>like books,kits,binders,audiovisual materials etc - to limit the entry of marc21 contents - like book title,publisher,physical dimensions of book etc.(Since i&#39;m a novice user, and have no knowledge in MARC21 fomats.<br>


<br>I had added books successfully to it. But when i give a search - in
a catalog with blank text(With out entering anthing and doing a
search), no items are displayed.<br><br>Is there anything related with zebra, to have this feature enabled. <br>
But if i give the keyword, the records are displayed , what may be problem<br>Wont koha accepts blank search(on click of go with search textbox being blank), to display all the records. I saw some of the demo sites.<br>it
worked well some times. some times, i have select the specific item
type to lists the available items in koha . But the catalog statistics
in Report link gives results 0. But the<br>
stock/inventory management - shows the results of available books.<br><br>kindly help me out to resolve this issues<br><br>4..suppose if each item has by default 2 weeks of loan period,from the date of checkout. -  Last day in end of 2 weeks, is the due date to return. how to set the grace period for the extra days. How long i can set the grace period. if the days to return crossed the grace period. hope the fine will be levied. aftewards, the card will be debarred. Is this is a usual mechanism in library. Let me know the details about this<br>
<br>-Sivasankari<br><br><br><br>